Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
*60mm-500mm,<70% |
This program is based on the buyer's raw materials of 60mm-500mm logs, wood moisture content < 70% |
,,, . |
If the raw materials are different, the production process is also different,Accordingly, the price of different equipment is also changed accordingly. |
* :1830*2750,15mm,16mm,18mm,18mm OSB |
Size of finished plate:1830*2750,thickness: 15 mm, 16mm,18 mm,OSB capacity is calculated according to the finished plate thickness of 18mm. |
1.100 m³/day:2173.032; |
100 m³/day OSB production line ex-factory price: CNY 21,730,320.00 |
2.:,,. 150. |
Installment: The buyer are responsible for the round-trip tickets and food ,accommodation cost. and the cost by epidemic isolation . The buyer also need pay the installment salary each workers of seller 150 USD per day . |
3.;,,,; |
Public works; Substation, water, making colloid, our company provide relevant technical parameters; |
4.;220/380V 50HZ (); |
Equipment power supply:220/380V 50HZ (Or configure the electrical appliance according to the data provided by the user) |
5.,,,.; |
According to the actual situation of the site, raw materials and user requirements, the production process and the corresponding equipment can be adjusted, Price changes accordingly. Our company provides the corresponding drawings and technical parameters for the user on-site self-made and self-purchas equipment. |
6.:,110,140;90.,6. |
Delivery time: In the case that the buyer has the necessary conditions and vigorously cooperate, Delivery of the first batch of equipment within 110days after the contract comes into effect.Complete equipment in 140 days,The supplier's installation team can conduct full line load test after entering the buyer's factory 90 days .normally, the domestic construction cycle is 6 months. |
7.15. |
This offer is valid for 15 days. |
Total Number of Staffs | 585 | |||
Total Number of Managers | 40 | |||
Total Number of Technical Staffs | 160 | |||
Total Number of QC Staffs | 15 | |||
Total Number of workers | 310 | |||
Total Number of other staffs | 60 | |||
Contact person | Mr .Su | Position | president | |