100ton Glucose Syrup Per 24hours

Product Details
Customization: Available
After-sales Service: 1 Years
Warranty: 1 Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (14)
  • 100ton Glucose Syrup Per 24hours
  • 100ton Glucose Syrup Per 24hours
  • 100ton Glucose Syrup Per 24hours
  • 100ton Glucose Syrup Per 24hours
  • 100ton Glucose Syrup Per 24hours
  • 100ton Glucose Syrup Per 24hours
Find Similar Products

Basic Info.

Model NO.
YS-560D
Nw
890
Gw
897
Brand
Jinrong
Term
Fob
Transport Package
Case
Specification
customied
Trademark
Jinrong
Origin
China

Packaging & Delivery

Package Size
55.00cm * 44.00cm * 33.00cm
Package Gross Weight
543.000kg

Product Description

Thank you very much for your attention to our equipment. Our production line can produce 100 tons of glucose syrup in 24 hours. Your production requirement is 70,000 tons/year, and 2 production lines are required. The material balance is as follows:
1. To produce 1 ton of glucose syrup, 900 kg of cassava starch is required.
2. To produce 1 ton of glucose syrup
2.1, 130 KwH of electricity is required.
2.2, 4~5 tons of process water is required.
2.3, 2 tons of steam is required.
2.4, 1~2 tons of cooling water is required.
Note: You need to send me the CAD drawings of the site or factory building so that we can make the equipment layout. The price of a single cassava starch is FOB2,816,666. Cassava production cassava starch equipment is not included. If necessary, it can be provided after confirming the glucose equipment.
The parameters, configuration and price of the equipment are as follows:
Project  Proposal
Capacity: 100Ton Glucose Syrup per 24Hours
  1. Process Description 
Glucose Syrup Processing Flow Chart
100ton Glucose Syrup Per 24hoursSeller should be responsible for dispatching the experienced technical personnel for on site technical supervision of installation, commissioning, and give the warranty for the equipment performance.

Within the scope of supervision of start-up, supplier shall provide the following supervisory service:
  1. Advise the Buyer's concerned employees of the operation procedure and maintenance of the plant.
 
  1. Set the time schedule of the installment giving details on the sequence of start-up of individual parts of the plant.
  2. Advise on the mode and method of starting-up of individual plant units.
  3. Advise the Buyer on the initial production run of the plant.
  4. Instruct and train Buyer's staff on details of normal production conditions of the plant, and special operating conditions and emergencies.
  5. Supervision of the daily activities of the Buyer's operating staff until the plant is ready for the trial run.
  6. Supervision of the Buyer's operating staff in the performance run test.
  7. Seller will be responsible for giving the detailed explanations for the technical documentations, drawings, operation manuals, equipment performance and relevant notice for the buyer's technical personnel, and answer & solve all technical questions.
Man-day specified in this section should meet all requirements from installment of whole production line, commissioning, test-run, performance test up to final acceptance. The buyer should service charge US$150/day for each technocrat. Also buyer should take charge of the round trip air tickets and accommodation for the technician.
    1. Training of personnel   
    1. Seller shall send the qualified technical personnel to provide effective training for the buyer 2 months ahead. And technical training center is set in the End-user's place.
    2. Seller will guarantee that after the technical training the technical personnel from buyer can skillfully operate & maintain the equipment, and skillfully adjust the technology & solve basic technical problems in time.
    3. The main training will adopt the terms of on-site training in the Client's plant, i.e the trainees will participate in the pre-operational activities of the plant. That includes the final erection activities, dummy runs, start-up and plant operation as well as necessary practices concerning equipment operation. This training will be completed by seller's supervisory personnel.
    1. After sales service
    1. The warranty period of the equipment and materials of the contract plant supplied by the Seller shall be 12 months after the date of acceptance of the contract plant by the Buyer, but not later than 18 month from the date of delivery or re-delivery.  
    2. Within the validity period of the contract, the Seller shall answer the questions from the Buyer in connection with the design and technical items in the supply scope of the contract and provide the relevant technical documentation to the Buyer free of charge.
    3. If any defective equipment and materials are found, the Buyer is obliged to notify the Seller within 1 week by fax and the Seller shall give a reply within 1 week.

No.
Equipment name Model   Power   Qty   Remarks: material and explanation
  1.  
 Bucket conveyor 15t/h 6.6kw  2 set  Stainless steel
  1.  
 Water measuring hopper 3    2 set  Carbon steel
  1.  
powder measuring hopper 4 6kw 4 set  Carbon steel
  1.  
Mixing slurry tank 16m3 17.6kw 8 sets  304 Stainless steel
  1.  
Pressure tank 4m3   1 set 304 Stainless steel
  1.  
Maintaining Tank 7m3   1 set 304 Stainless steel
  1.  
Laminar flow tank 4m3   4sets 304 Stainless steel
  1.  
Liquid ejector HYW-7   2 sets 304 Stainless steel
  1.  
Liquid ejector pump G60-1 22kw 2 sets Stainless steel
  1.  
Type of Plate heat-exchanger 30   1 set 304 Stainless steel
  1.  
Buffer tank 32 6kw 2 set Stainless steel
with mixer
  1.  
    Plate-and-frame filter press machine 150   9kw 4 set PP with tray slot
  1.  
Saccharification tank 36m3 48kw 6 sets  
304 Stainless steel,
with pipes and agitator
  1.  
Exit Saccharification tank Transfer pump ISWH80-160(I)B 30kw 2 sets Stainless steel
  1.  
Decolorization tank 18m3 12kw 4 sets 304 Stainless steel,
 with pipes and agitator
  1.  
Decolorization tank Transfer pump IHW65-160(I) 15kw 2 sets Stainless steel
  1.  
  IHW65-160(I)B 11kw 2 sets  
  1.  
Plate-and-frame filter press machine 150m2 18kw 6 sets PP
  1.  
Based groove of filter press 4 m3   4 sets 304 Stainless steel
  1.  
Transfer tank 5m3   4sets 304 Stainless steel
  1.  
Type of plate heat-exchanger 20m2   1 set 304 Stainless steel
  1.  
Transfer tank 20 m3 8kw 1 sets Stainless steel
  1.  
Anion cation
exchange column
Φ1600mm

 
  3 sets
 
Carbon steel
 with inner rubber
    Φ1600mm   3sets
 
 
  1.  
Transfer tank 20 m3 8kw 2 sets Stainless steel

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now