Customization: | Available |
---|---|
Certification: | CE, ISO |
Place Style: | Vertical |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Qualified raw materials such as lime and coke are transported into the factory by truck and stored in the corresponding raw material shed. Lime and coke are added to the batching trolley respectively, weighed on the electronic scale, and then transported to the workshop of the second floor of the electric furnace by the trolley, and the material is added to the furnace manually.
The charge enters the calcium carbide furnace, and the 11KV power supply introduces the current into the furnace through the three-phase electrode of the transformer. The electrode generates arc heat between the charge and the bottom of the furnace, and then transmits it to the furnace filled with the charge. Through arc heat and resistance heat, the mixed material can be reduced to calcium carbide.
During the entire smelting process, the voltage level and current intensity on the electrode are set according to the smelting process parameters, and the values of voltage and current are different in different periods, that is, the power in the input furnace is different, the electrode is inserted in the furnace charge, and the gas escapes evenly from the entire material surface.
The uniformly mixed charge is added to the furnace in small batch with the drop of the charge surface, so that the charge surface in the furnace maintains a certain height, and the shape of a flat cone is displayed around the electrode. When the liquid calcium carbide reduced in the furnace is stored to a certain extent, calcium carbide is released from the oven.
Under the prescribed power supply system, the electric furnace is fired once at an average interval of 1 hour, 24 furnaces a day, and the amount of calcium carbide is about 0.7t. After the calcium carbide is finished, the trolley and calcium carbide pot are pulled to the cooling room by the tractor. Calcium carbide is cooled for about 5 to 6 hours, and is lifted with a crane. After being broken, it is put into an iron cylinder and stored.
Each discharge of calcium carbide furnace sample analysis once, each sample analysis is required to provide the results of the furnace length and in front of the furnace within 1 hour.
Smelting and pouring are three shifts, and the annual operation days are 330 days.
The flue gas produced by the electric furnace smelting enters the dust removal flue through the smoke hood and chimney, and the flue gas generated when the calcium carbide is emitted also enters the dust removal flue through the top suction hood. After the two parts of the flue gas are summarized, it enters the positive pressure large cloth bag dust collector, and the dust purification reaches the emission standard stipulated by the State.
The cooling water of the electric furnace is supplied by the water pump station. After cooling the cooling water into the electric furnace, the cooling water is naturally returned to the cooling pool by using the drop. After cooling in the pool, the water is supplied to the furnace by the pump for recycling.
Grain size mm |
Chemical composition /% | |||||||
CaO | Activity degree | SiO2 | MgO | R2O3 | P | S | Underburnt | |
≥ | ≤ | |||||||
30~60 | 96 | 360 ml | 2 | 1.5 | 2 | 0.01 | 0.04 | 5 |
Grain size mm |
Physical and chemical indicators/% | ||||
Fixed carbon | Volatility percentage | Ash percentage | S | H2O | |
≥ | ≤ | ||||
20~25 | 82 | 15 | 10 | 1 | 2 |
Transformer capacity | 3000KVA |
Primary side voltage | 11KV |
Secondary voltage | 84 ~ 112 (V) |
Secondary side voltage series | 8, stage difference: 4V |
Common voltage | 96 (V) |
Secondary current | 21651 (A) |
Electrode diameter | Φ600mm |
Pole diameter | Φ1500mm±50mm |
Furnace diameter | Φ3600(mm) |
Shell diameter | Φ4800mm |
Furnace depth | 1800mm |
Shell height | 3400mm |
Low hood height | 1700mm |
Electrode stroke | 1000mm |
Electrode lifting speed | 0.5m/min |
Cooling water consumption | 180t/h |
We provide professional customized services to meet different capacity needs.
40 Feet Container or Customized
Total Number of Staffs | 585 | ||
Total Number of Managers | 40 | ||
Total Number of Technical Staffs | 160 | ||
Total Number of QC Staffs | 15 | ||
Total Number of workers | 310 | ||
Total Number of other staffs | 60 | ||
Contact person | Mr .Su | Position | President |