Customization: | Available |
---|---|
Production Scope: | Product Line |
Condition: | New |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1).Product program:
1. Unit working surface elevation: +1000mm
2. Production speed of the unit: 15-45m/min
3. Raw materials:
3.1 Raw steel strip: Steel strip is low carbon steel, low alloy steel and high strength steel with δb≤600Mpa and δs≤450Mpa
3.2 Size of raw material strip:
Strip thickness: 3.0 ~ 10.0mm;
Strip width: 350 ~ 700mm;
Outer diameter of steel coil: Minφ1000mm, Maxφ2000mm;
Inner diameter of steel coil: Minφ508mm, Maxφ610mm
Volume weight: ≤8t
4. Product outline
4.1 Pipe diameter: Φ114 ~ Φ219mm;
4.2 Thickness: 3.0 ~ 10.0mm;
4.3 Pipe length: 6m ~ 8m;
4.4 Measuring accuracy: ±3mm;
4.5 Outer diameter tolerance of steel pipe: ±0.3mm;
2).Production line equipment composition
This production line consists of uncoiling machine, levelling machine, shearing butt welding machine, horizontal lofting machine, forming sizing machine, solid state high frequency welding machine, on-line weld eddy current inspection, hot saw, flat head machine, hydraulic press, output raceway and control system.
Φ219X10 High Precision Straight Seam Welded Pipe Production Line
Production line equipment composition
1. Uncoiling machine
Body and drum, press roller device, screed drive device, shovel head straight head device, brake system, hydraulic system, coil stopping device, operating table.
Equipment working principle and characteristics:
The uncoiler is used to support the tape coil and provide raw materials for the production line.
The structure adopts the form of active uncoiling cantilever drum with hydraulic four-link expansion and contraction. The press roller is driven by hydraulic motor, which can realize active and passive, complete the function of finding and preventing loose coil; The shovel head straight head function is realized by the hydraulic cylinder; Equipped with lead straightening roller device; Coil anti-loosening device; Coil inertial braking damping device; The coil blocking device is end-face coil blocking to prevent loose coil; Hydraulic system and electronic control operating system, can achieve up and down unwinding.
Structural form | Single reel type |
Unwinding speed | ~ 12m/min |
Leveling form | upper 3 rolls, lower 4 rolls |
Leveling down form | hydraulic |
Leveling speed | 6m/min |
Drive motor | 7.5kw |
Pinch, levelling roller material | 42CrMo, tempering treatment, surface high frequency quenching. |
Working cycle | Max 4min |
Shear mode | hydraulic |
Sewing mode | manual |
Welding mode | automatic or manual |
Welding torch travel | AC servo drive |
Welder power | 18KW |
Net storage length | 600 ~ 1000m |
Maximum charging speed | 100m/min |
Discharge method | passive pull out, tracking unit speed |
Structure form | outside in inside out, fixed ring type, centralized transmission |
Control mode | frequency conversion speed regulation |
5.1 Feeding | (1) Composition: 1 feed flat roller frame, 5 roller passive leveling, 2 feed vertical roller; (2) The function is to fine-level the strip steel before forming to improve the quality of the finished pipe; |
5.2Flat roll frame |
(1) The shaft diameter is φ140mm, the material is 42CrMo (tempering, surface high-frequency quenching); (2) Gantry frame. |
5.3 Vertical roll frame | (1) Double fulcrum roller box structure. (2) Shaft diameter φ90mm, material is 40Cr (tempering, surface high-frequency quenching); |
5.4 Guide Rack | (1) Adopt a set of two-roll weld guide device. (2) The guide roller unit can move along the direction of the rolling line to adjust the size of the opening Angle. |
5.5 Extrusion Rack | (1) The method is four-roll extrusion, and the whole is a box-type gantry structure; (2) The side roller bearing is in the slider, and the level of the side roller can be fine-tuned; (3) The upper roll can be adjusted up and down and around the whole, but also can be fine-tuned separately. |
5.6 Scraping and welding frame | It consists of two sets of scraper devices and is equipped with a burr winding device. The height position of the scraper is manually adjusted, and the tool holder has a pneumatic fast feed and tool lifting device. The tool holder can be manually adjusted to fine-tune the height and lateral position. Adjustable roller height. Tool bar size shall be provided by the customer. 1) Double planer type; 2) The planer lift adopts CAM type, which can quickly lift and fine-tune up and down; |
5.7 Polish the rack | Parameters are fed into the flat roller frame, passive |
5.8 Cooling System | Spray soaking method, length 3 meters. |
5.9 Straightening Racks | 1) Function: Used for straightening steel pipe. 2) Structure: four-roll passive type |
5.10 Power and transmission system | 1) Forming and sizing using separate transmission mode, forming using 160KW×2 two DC motor drive, sizing using 250KW a DC motor drive; 1) The molding and sizing frame are double drives of upper and lower shafts. 2) Distribution gear box spiral bevel gear module m=16, material 20CrMnTi. |
Nominal power: 500kW | Rated DC power: Pd=600kW |
Rated DC voltage: UdN=450V | Rated DC current: IdN=1330A |
Overall efficiency: η≥85% | Output power: Pout > 500kW |
Design frequency: f=200~300kHz | MOSFET inverter: 120kW x 5 |
Channel output form: no welding transformer output, secondary resonance |
Nominal power: 500kW | Rated DC power: Pd=600kW |
Incoming power factor: COSφ≥0.9 | Power distribution capacity: S≥670kVA |
Power supply voltage: three-phase 380V/50Hz | Incoming line current: I=1090A |
Incoming cable: Each phase uses two 240mm2 copper cables in parallel, three-phase four-wire system |
Water-water heat exchanger is used | Internal circulating water pressure: 0.15~0.25MPa |
Internal circulation water flow: 30m3/h | Inner circulating water outlet temperature: ≤40ºC |
Return water temperature of internal circulating water: ≤55ºC | Heat exchanger area: 20m2 |
External circulation water flow: 50m3/h (user provided) | External circulating water inlet temperature: ≤35ºC |
Temperature rise of circulating water outside heat exchanger: ≤15ºC | Inlet pressure: 0.25 ~ 0.3MPa (about 2.5 ~ 3kg/cm2) |
External circulation pool capacity: ≥50m3 |
Length | 6 ~ 12m (continuously set within 20m) |
Measuring accuracy | ≤±3mm |
Cutting mode | double saw blade, milling type |
Tracking speed | 20 ~ 45m/min |
Equipment function | automatic, manual, with the function of cutting short feet (short feet length: ≥4 m) |
Control mode | AC servo positioning |
Steel pipe length: 6 ~ 8 m | Outer diameter of steel pipe: φ114 ~ φ219 mm |
Steel pipe wall thickness: 3 ~ 10 mm | Material: Q235; Q345 |
The condition of steel pipe end face: the inner and outer circle is flat, and the positive deviation is not more than 0.5mm | |
Pipe end groove: according to the specific process parameters (30° ~ 35°/22° ~ 25°) | Blunt edge size: ≥1.6± 0.8mm |
Pipe end cutting: ≤1.6mm | Chamfering mode: single root |
1 | Structural style | 2 Beam type | |
2 | Number of test tubes/time | Piece | 1 |
3 | Test pressure | MPa | 5 - 21 |
4 | Holding time | S | 5~30 Adjustable |
5 | Test efficiency | 60-70 Pieces/H | |
6 | Sealing mode | Radial seal | |
7 | Pressure test blind area | mm | ≤80 Single-terminal |
8 | Pressure testing medium | Emulsion | |
9 | Applicable pipe length range | m | 6- 15 |
10 | Operating mode | Three ways: Manual, semi-automatic and fully automatic |
We provide professional customized services to meet customers' different capacity needs.
Warranty period: 1 year
40 Foot Container
No. | Product Name | Specification&Model | Unit | Unit Price | Total Price |
1 | Series solid state high frequency welder | TZGGP-250KW/0.35-C | 1Set | 55,890.41 | 55,890.41 |
2 | Equipment contains | Rectifier cabinet | 1Unit | ||
3 | Inverter cabinet | 1Unit | |||
4 | Operating table | 1Unit | |||
5 | Drag cabinet | 2Units | |||
6 | Air conditioner | 1Unit | |||
7 | Air-water cooling | 1Unit | |||
Two dimensional adjusting bracket | 1Unit | ||||
Price (RMB): FOB Tianjin Port ¥ 55890.41 Payment method: Sign the contract, make a 50% advance payment, and settle the remaining balance before shipment Delivery period: Within 30 working days after receiving the advance payment. Other content Export packaging including the entire set of welding machines. Includes welding machine inverter cabinet support platform, rectifier cabinet, drag cabinet, high-frequency control cables, main cables, and electrical accessories. |
Information provided
Total Number of Staffs | 585 | ||
Total Number of Managers | 40 | ||
Total Number of Technical Staffs | 160 | ||
Total Number of QC Staffs | 15 | ||
Total Number of workers | 310 | ||
Total Number of other staffs | 60 | ||
Contact person | Mr .Su | Position | President |