Bridge Crane with Grab Bucket

Product Details
Customization: Available
After-sales Service: Available
Warranty: One Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (14)
  • Bridge Crane with Grab Bucket
  • Bridge Crane with Grab Bucket
  • Bridge Crane with Grab Bucket
  • Bridge Crane with Grab Bucket
  • Bridge Crane with Grab Bucket
  • Bridge Crane with Grab Bucket
Find Similar Products

Basic Info.

Model NO.
111
2
2
3
3
4
4
Transport Package
1
Specification
1
Trademark
LNJR
Origin
China

Packaging & Delivery

Package Size
200.00cm * 100.00cm * 100.00cm
Package Gross Weight
100.000kg

Product Description

    1. Each crane (16 tons) must be equipped with:
 
  • a hinged grab of at least V = 4 m3 (the width of the grab should not exceed no more than 2.3 m in the open state for unloading HBI from gondola cars, the weight of the lifting tool is 5.6 t);
 
  • a round electromagnet Ø 2150 mm (the mass of HBI transported with a density of
2.5 t / m3 per cycle must be at least 3.8 t);
  • with a magnetic station;
 
  • a system of ladders and platforms required for maintenance and repair of mechanisms and electrical equipment;
 
  • centralized lubrication system;
  • current collectors of standard design;
  • a cradle for trolley service;
 
  • stationary jacks for the purpose of using them for the repair of wheels and axle boxes of the crane;
 
  • for fastening bogie rails, use clamping strips with a convenient adjustment system.



Magnet capacity related to scrap density
  Heavy   Middle     Easy
  (2800 kg / m3)   (1500 kg / m3)   (700 kg / m3)
  4300   2400     1300
           
No. Name     unit of measurement Value
1 Carrying capacity (not less)     t 16
2 Crane span     m 27.5
3 Lifting height (not less)     m 21
4 Height of the crane from the level of the head of   mm 3750
  the crane rail, (no more)          
5 Crane rail head width,     mm KR100
6 Working hours         A7 according to ISO
              4301
7 Ambient temperature in the area of the crane   FROM* from -20 to +50
8 Climatic modification according to GOST 15150-       U2
  69            
9 Power circuits     IN Three-phase, variable,
          Hz 380/220 +/- 10%
              50 +/- 0.2
10 Control circuits     V / VDC 220/24
          Hz 50 +/- 0.2
11 Current lead         Trolley
12 Lifting speed (not less)     m / min 20
13 Crane travel speed (not less)     m / min 80
14 Trolley travel speed (not less)     m / min 40
15 Cab movement speed (not less)     m / min 20
Bridge Crane with Grab BucketBridge Crane with Grab BucketBridge Crane with Grab BucketBridge Crane with Grab BucketBridge Crane with Grab Bucket

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now