1. Equipment installation and operation conditions
6.1 Total installed capacity: 65Kw
6.2 Floor Area: Approximately 2500 * 2000 * 2800 (W * D * H, mm)
6.3 The place where the electric furnace is installed should meet the requirements of vacuum hygiene, and the surrounding air should be clean and dry, with good ventilation conditions. The workplace should not easily raise dust, etc.
6.4 Cooling water flow rate: 7-8m ³/h, water pressure: 0.2-0.4MPa, water temperature: ≤ 30 ºC (to prevent unnecessary losses caused by sudden power outages, there should be at least one backup water source around the equipment, and attention should be paid to keeping the circulating water pipes warm in winter).
6.5 Compressed air: pressure: 0.4-0.6MPa, consumption: 3L/s
6.6 Lifting equipment: 3-5 tons
2. Random data
7.1 Plan layout with annotated outline dimensions
7.2 Equipment Overview
7.3 Electrical schematic diagram
7.4 Equipment Maintenance and Use Manual
7.5 User Manual and Certificate of Conformity for Main Supporting Products
7.6 Schematic diagram of gas and water circuits
3. Installation and debugging
Within one month after the contract takes effect, we will provide the user with equipment foundation construction drawings and equipment installation interface conditions.
After the equipment arrives at the user's installation site, we will send installation engineers to the site within 5 working days for installation and debugging, until the equipment fully meets the technical specifications and ensures that the product meets the relevant technical requirements.
8.3 Equipment Installation: When assembling the equipment, the equipment installation personnel shall clean all components of the equipment as necessary to ensure its performance and reduce the repair rate.
8.4 Equipment Debugging: Equipment debugging personnel strictly follow technical specifications when debugging equipment until all indicators of the equipment meet the design requirements.
4. Service Requirements
a) Training and installation debugging
We provide training to the users on the use and daily maintenance of the equipment. Due to the special nature of the equipment, it is recommended to assign a dedicated person to handle it, and strictly implement equipment usage regulations for beginners, such as pre use training, post use inspection, and recording of operation and use.
b) Warranty period
The warranty period is 12 months from the date of factory acceptance.
c) After sales service
We promise to provide lifelong after-sales service, including equipment maintenance and repair, and the provision of spare parts. Our technical personnel will respond to the user's written repair request within 8 hours (working days). If it is necessary to rush to the user's work site, our technical personnel will bring the corresponding components to the user's work site within 48 hours of receiving written notice.
Liaoning Jinrong Machinery Import and Export Co., Ltd. is a company with its own import and export rights, and is a large group company integrating industry and trade. The registered capital of the company is RMB 180 million. The company includes metallurgical equipment manufacturing company, electric furnace equipment manufacturing company, electrical equipment manufacturing branch, mechanical processing branch and metallurgical design and research Institute.
Our company can undertake all kinds of metallurgical equipment design, manufacturing, installation, commissioning, trial production turnkey project. Our company can provide mining machinery and equipment, ironmaking blast furnace, sintering machine, coke oven, converter, electric arc furnace, ladle refining furnace, continuous casting equipment, steel rolling furnace, steel rolling production line, steel structure plant and crane and other metallurgical equipment and metallurgical machinery. Various other types of mechanical equipment are also available.
Our company is the direct agent of Anshan Steel, Bensteel, Fusteel and other large steel mills, the variety of steel is complete: pipe, plate, profile, wire and so on are in stock. If the special specifications, materials and other requirements, we can organize the order to purchase, schedule production and rolling, to ensure supply.
Our company has a history of 30 years, and now has established friendly contacts with more than 120 countries and regions and carried out various aspects of cooperation. We welcome customers from all over the world to visit our company.
Location :1-51-901-3041, Floor 9, Jiangsu Building, Qianyuan Emerging Market, Tiexi District, Anshan City, Liaoning Province