Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Screen tube completion is a commonly used horizontal completion method internationally at present, which involves inserting a screen tube into the production horizontal section to support the wellbore and prevent collapse.
Quadruple Tandem Wire Rolling Mill
This machine is suitable for the production and processing of various metal flat wire, square wire, wedge wire and non-standard shaped wire, a one-time adjustment of wire shape, the whole process of a worker to control the continuous production of the whole machine.
Usage | Production and processing of metal shaped wire |
Busbar range | Medium 0.65- medium 7mm |
Conventional finished product size | width 1-10mm high 0.2-4.5mm(if there are special size requirements, can be customized) |
Speed | 30m/min |
Power | No.1 flat rolling mill 5.5KW No.2 forming mill 5.5KW No.3 finishing mill 5.5KW No.4 precision rolling mill 5.5KW Wire collection device 2.5KW |
Host machine | 6070MM*1250MM*1340MM,3300kg |
CNC cabinet | 590MM*380MM*1200MM .80kg |
Take-up device | 1800MM*1780MM*1200MM,150kg |
Power voltage | Three-phase AC 380V |
Controller supply voltage | DC24V |
Sensor type | NPN Normally Open |
Cutting length | 50mm-6500mm |
Numerical control cabinet | 1000*500*400 |
Motor power | 2.5kw+1.5kw |
Host machine | 1500*900*1100 |
Total weight | 250 kg |
The reservoir is not damaged by cement slurry;
Total Number of Staffs | 585 | ||
Total Number of Managers | 40 | ||
Total Number of Technical Staffs | 160 | ||
Total Number of QC Staffs | 15 | ||
Total Number of workers | 310 | ||
Total Number of other staffs | 60 | ||
Contact person | Mr .Su | Position | President |