Main equipment of thermal furnace
electric furnace transformer:
Three-phase transformer model type: HSSP-12500kVA/33kV
Rated capacity (KVA): 12500,Long-term overload 20%, short-term overload 30%
Cooling-down method : OFWF,≯32ºC,≯45ºC.
Primary voltage (KV): 33
Secondary voltage (V) 134~182V,(Grade difference: 3V, a total of 17 levels)
Secondary rated voltage(V) 158
Secondary rated current(kA) 45.68
Short-circuit impedance At 158V < 6%, coil internal impedance ≤5%
Connection mode: Iio
Voltage regulating mode : Wireless electric
Insulation level : BIL480Ac200
Cooling-down method : Forced oil circulation water cooling
Side outlet terminal: 3 phase 8 Ф 65 / 45 0-0.02, length 200 mm
Three-phase joint class group: △/△-12
Frequency(HZ): 50
Liaoning Jinrong Machinery Import and Export Co., Ltd. is a company with its own import and export rights, and is a large group company integrating industry and trade. The registered capital of the company is RMB 180 million. The company includes metallurgical equipment manufacturing company, electric furnace equipment manufacturing company, electrical equipment manufacturing branch, mechanical processing branch and metallurgical design and research Institute.
Our company can undertake all kinds of metallurgical equipment design, manufacturing, installation, commissioning, trial production turnkey project. Our company can provide mining machinery and equipment, ironmaking blast furnace, sintering machine, coke oven, converter, electric arc furnace, ladle refining furnace, continuous casting equipment, steel rolling furnace, steel rolling production line, steel structure plant and crane and other metallurgical equipment and metallurgical machinery. Various other types of mechanical equipment are also available.Total Number of Staffs | 585 | |||
Total Number of Managers | 40 | |||
Total Number of Technical Staffs | 160 | |||
Total Number of QC Staffs | 15 | |||
Total Number of workers | 310 | |||
Total Number of other staffs | 60 | |||
Contact person | Mr .Su | Position | president | |