Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
NO. | I | Specification | Remark |
1 | Kiln width | 9.38m | Distance between two rails |
2 | Kiln length | 150m | |
3 | Rail diameter | 150m | Outside rail |
4 | Inside height | 1.6m | |
5 | Stacking floors | 14 floors | |
6 | Daily capacity | 150000 | 9*4*3inch |
7 | Rate of final products | ≥99% | |
8 | Firing period | 42 hours | |
9 | Firing temperature | 850--1050ºC | |
10 | Stacking way | Robot stacking | |
11 | Extrusion pressure | 4.0MPa | |
12 | Extruder vacuum degree | ≤-0.092 MPa | |
13 | Clay shrinkage | ≤2% | |
14 | Clay plasticity | 7-15 | |
15 | Clay moisture | 15-18% |
NO. |
Name |
SPE |
Unit |
QTY |
Unit orice (USD) |
Total price (usd) |
Power(kw) |
||||||
One,Material process equipment | |||||||||||||
1 | Box feeder | GD100 | Set | 2 | 10972 | 21944 | 11*2 | ||||||
2 | Belt conveyor | PS650*10000 | Set | 1 | 2626 | 2626 | 5.5 | ||||||
3 | Coal batching plant | 10CBM | Set | 1 | 14306.5 | 14306.5 | 7.5 | ||||||
4 | Hammer crusher | KTP1100*1000 | Set | 1 | 31859.1 | 31859.1 | 132 | ||||||
5 | Belt conveyor | PS650*10000 | Set | 1 | 2626 | 2626 | 5.5 | ||||||
6 | Roller screen | GDS1500*4500 | Set | 1 | 6565 | 6565 | 5.5 | ||||||
7 | Belt conveyor | PS650*10000 | Set | 1 | 2626 | 2626 | 5.5 | ||||||
8 | Electric control box | Set | 1 | 7800 | 7800 | ||||||||
9 | Sub-total(USD) | 90352.6 | 183.5 | ||||||||||
Two,Brick shaping equipments | |||||||||||||
10 | Box feeder | GD100 | Set | 1 | 10972 | 10972 | 11*2 | ||||||
11 | Belt conveyor | PS650*10000 | Set | 1 | 2626 | 2626 | 5.5 | ||||||
12 | Double roller crusher | SGP800*600 | Set | 1 | 9418.5 | 9418.5 | 18.5+15 | ||||||
13 | Belt conveyor | PS650*10000 | Set | 1 | 2626 | 2626 | 5.5 | ||||||
14 | Double shaft mixer | SJ500*4000 | Set | 1 | 30160 | 30160 | 90 | ||||||
15 | Belt conveyor | PS650*10000 | Set | 1 | 2626 | 2626 | 5.5 | ||||||
16 | High speed roller crusher | GS800*600 | Set | 1 | 16198 | 16198 | 30+22 | ||||||
17 | Belt conveyor | PS650*20000 | Set | 2 | 5252 | 10504 | 5.5 | ||||||
18 | Vacuum extruder | JKY75/65 | Set | 1 | 156000 | 156000 | 355+132 | ||||||
19 | Vacuum pump | Set | 1 | 5200 | 5200 | 22 | |||||||
20 | Air compressor | Set | 2 | 942.5 | 1950 | 15 | |||||||
21 | Clay strip and billet cutter | Set | 1 | 25389 | 25389 | 11 | |||||||
22 | Belt conveyor | PS650*20 | Set | 1 | 5252 | 5252 | 11*2 | ||||||
23 | Control box for brick shaping equipment | Set | 1 | 44752.5 | 44752.5 | ||||||||
Sub-total(USD) | 323674 | 786.5 | |||||||||||
Three,Robot stacking system | |||||||||||||
24 | Billet steeping machine | Set | 1 | 8970 | 8970 | 4 | |||||||
25 | Billet loading machien | Set | 1 | 26812.5 | 26812.5 | 7.5 | |||||||
26 | Billet unloading machine | Set | 1 | 26812.5 | 26812.5 | 7.5 | |||||||
27 | Billet stocking machine | Set | 1 | 12086.1 | 12086.1 | 3 | |||||||
28 | Billet distributing machine | Set | 1 | 16920.8 | 16920.8 | 5.5 | |||||||
29 | Robot (Kuka) | 500kg | Set | 2 | 94120 | 188240 | 45+45 | ||||||
30 | Robot clamping head | Set | 2 | 16586.7 | 33173.4 | ||||||||
31 | Air tank | Set | 1 | 1348.1 | 1348.1 | ||||||||
32 | Air compresor | Set | 1 | 7879.3 | 7879.3 | ||||||||
33 | Stabilizer | Set | 1 | 3732.3 | 3732.3 | ||||||||
34 | filter | Set | 3 | 187.2 | 561.6 | ||||||||
35 | Dryer | Set | 1 | 1762.8 | 1762.8 | 11 | |||||||
36 | Platform transmission parts and drive system (including counter) | Set | 1 | 12439.7 | 12439.7 | 16 | |||||||
37 | Robot connection base | Set | 2 | 3109.6 | 6219.2 | ||||||||
38 | Control room | Set | 1 | 2405 | 2405 | ||||||||
Sub total(USD) | 349363.3 | 144.5 | |||||||||||
Four,Desulfurization system | |||||||||||||
39 | Desulfurization tower | 1 | 140887.5 | 140887.5 | |||||||||
40 | Centrifugal fan | 2 | 37915.8 | 75831.6 | 264 | ||||||||
41 | Smoke channel Annular flue moving cover | 72 | 399.1 | 28735.2 | |||||||||
42 | Spray pump | 2 | 4661.8 | 9323.6 | 11 | ||||||||
43 | Cleaning pump | 1 | 206.7 | 206.7 | 2.2 | ||||||||
Sub total(USD) | 254984.6 | 284.7 | |||||||||||
Five,Rotary Kiln system | |||||||||||||
44 | Kiln body driving wheel | Set | 22 | 1657.5 | 36465 | ||||||||
45 | Kiln body passive wheel | Set | 120 | 435.5 | 54828.8 | ||||||||
46 | Kiln body drive system | Set | 22 | 1450.8 | 31907.2 | 50 | |||||||
47 | Ring conveyor driving wheel | Set | 20 | 952.9 | 19061.9 | ||||||||
48 | Ring conveyor passive wheel | Set | 180 | 140.4 | 25360.4 | ||||||||
49 | Ring conveyor drive system | Set | 20 | 379.6 | 7592 | 44 | |||||||
50 | Kiln wheel rail | m | 924 | 53.3 | 49249.2 | ||||||||
51 | Kiln slide wire | lot | 1 | 66862.9 | 66862.9 | ||||||||
52 | Furnace blower1 | Set | 2 | 13910 | 27820 | 55*2 | |||||||
53 | Furnace blower2 | Set | 2 | 3749.2 | 7498.4 | 7.5*2 | |||||||
54 | Wear-resistant seal | Roll | 50 | 167.7 | 8385 | ||||||||
55 | Fire-resistant cotton | Lot | 1 | 245531 | 245531 | ||||||||
56 | Kiln door cloth | Roll | 2 | 397.8 | 795.6 | ||||||||
57 | Kiln door motor | Set | 2 | 341.9 | 683.8 | ||||||||
58 | Coal calorific value measuring instrument | Set | 1 | 9640.8 | 9640.8 | ||||||||
59 | Furnace equipment electric control system | Set | 1 | 7605 | 7605 | ||||||||
60 | Kiln operation control room | Set | 1 | 2405 | 2405 | ||||||||
61 | Furnace technical guidance fee | 130000 | 130000 | ||||||||||
Sub total(USD) | 731702.4 | 219 | |||||||||||
Total (USD) | 1750066.5 | 1573.2kW |
Working time | Raw material handling |
Green brick forming |
Firing Tunnel kiln |
Fired brick stacking |
Per year (days) | 300 | 300 | 300 | 300 |
Per week (days) | 7 | 7 | 7 | 7 |
Shift/day | 1 | 1 | 2 | 1 |
Hours/shift | 8 | 8 | 12 | 10 |
Working time (hrs) /day | 8 | 8 | 24 | 10 |
Position | 1st Shift | 2nd Shift | Total(people) |
Raw material handling | 3 | 0 | 3 |
Green brick forming and robot | 5 | 0 | 5 |
Drying & Firing& | 1 | 1 | 2 |
Electrician class | 1 | 0 | 1 |
fired brick unloading | 10 | 0 | 10 |
Production subsidiary | 5 | ||
Production management | 5 | ||
Total | 31 people |
NO. | Name | Engineer QTY |
Days | Unit price (USD/P/D) |
Total (USD) |
Remark |
1 | Brick machine installation | 4 | 120 | 120 | 57600 | Will charge according to real days |
2 | Anti-fiber installation | 2 | 30 | 120 | 7200 | |
3 | Kiln electrical engineer | 1 | 60 | 150 | 9000 | |
4 | Robot engineer | 1 | 30 | 150 | 4500 | |
5 | Kiln engineer | 2 | 150 | Will charge after 3 months |
||
6 | Visa charge | 6 | 210 | 1260 | ||
7 | Total(USD) | 79560 |
Total Number of Staffs | 585 | |||
Total Number of Managers | 40 | |||
Total Number of Technical Staffs | 160 | |||
Total Number of QC Staffs | 15 | |||
Total Number of workers | 310 | |||
Total Number of other staffs | 60 | |||
Contact person | Mr .Su | Position | president | |
Tel | 0086-412-8554538 | Mobile | 0086-13700125807 | |
Fax | dbgi689hsx@ |