Customization: | Available |
---|---|
After-sales Service: | Negotiated |
Warranty: | Negotiated |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Heavy | Middle | Easy | |||||
(2800 kg / m3) | (1500 kg / m3) | (700 kg / m3) | |||||
4300 | 2400 | 1300 | |||||
No. | Name | unit of measurement | Value | ||||
1 | Carrying capacity (not less) | t | 16 | ||||
2 | Crane span | m | 27.5 | ||||
3 | Lifting height (not less) | m | 21 | ||||
4 | Height of the crane from the level of the head of | mm | 3750 | ||||
the crane rail, (no more) | |||||||
5 | Crane rail head width, | mm | KR100 | ||||
6 | Working hours | A7 according to ISO | |||||
4301 | |||||||
7 | Ambient temperature in the area of the crane | FROM* | from -20 to +50 | ||||
8 | Climatic modification according to GOST 15150- | U2 | |||||
69 | |||||||
9 | Power circuits | IN | Three-phase, variable, | ||||
Hz | 380/220 +/- 10% | ||||||
50 +/- 0.2 | |||||||
10 | Control circuits | V / VDC | 220/24 | ||||
Hz | 50 +/- 0.2 | ||||||
11 | Current lead | Trolley | |||||
12 | Lifting speed (not less) | m / min | 20 | ||||
13 | Crane travel speed (not less) | m / min | 80 | ||||
14 | Trolley travel speed (not less) | m / min | 40 | ||||
15 | Cab movement speed (not less) | m / min | 20 |
Scrap density | Scrap density | Density of | Density of | Density of | Density HBI | Density of |
0.5 (t / m3) | 0.6 (t / m3) | heavy scrap | crushed | DRI 1.5 (t / | 1.5 (t / m3) | pig iron |
0.7 (t / m3) | cleaned scrap | m3) | 3.3 (t / m3) | |||
0.9-1.1 (t / | ||||||
m3) | ||||||
2400 | 2850 | 3300 | 3400 | 3575 | 4400 | 5500 |
No. | Name | unit of measurement | Value |
1 | Carrying capacity (not less) | t | 25 |
2 | Crane span | m | 27.5 |
3 | Lifting height (not less) | m | 21 |
4 | Height of the crane from the level of the head of | mm | 3750 |
the crane rail, (no more) | |||
5 | Crane rail head width, | mm | KR100 |
6 | Working hours | A7 according to ISO | |
4301 | |||
7 | Ambient temperature in the crane | FROM* | from -20 to +50 |
8 | Climatic modification according to GOST 15150- | U2 | |
69 | |||
9 | Power circuits | IN | Three-phase, variable, |
Hz | 380/220 +/- 10% | ||
50 +/- 0.2 | |||
10 | Control circuits | V / VDC | 220/24 |
Hz | 50 +/- 0.2 | ||
11 | Current lead | Trolley | |
12 | Lifting speed (not less) | m / min | 30 |
13 | Crane travel speed (not less) | m / min | 60 |
14 | Trolley travel speed (not less) | m / min | 100 |
15 | Cab movement speed (not less) | m / min | 20 |